For home backup, size the battery from the equipment the owner wants to keep running and the time it must run. Then check whether the battery and inverter can supply the largest simultaneous load and any startup demand.

A household’s monthly electricity bill is useful background, but an outage plan is usually more specific. The owner may want lighting, refrigeration and communications while leaving electric heating or other large loads off.

Agree on the backup circuits first

Ask the owner to identify what must remain available during an outage. For each item, record running power, likely operating time and any startup requirement. Use measured consumption where possible, especially for equipment that cycles on and off.

The SAM grid-outage documentation treats critical load as a separate input for outage analysis. The same separation makes an installer quote easier to review: normal household consumption and the selected backup load should have their own records.

An illustrative four-hour plan might look like this:

Selected equipment Assumed average power Time Energy
Lighting 60 W 4 hours 240 Wh
Router and communications 20 W 4 hours 80 Wh
Laptop 65 W 2 hours 130 Wh
Refrigerator 80 W average over the period 4 hours 320 Wh
Total 770 Wh

These are assumed values for a calculation. In particular, the refrigerator’s average power does not describe its compressor-starting demand. Replace the assumptions with information for the actual appliances before selecting equipment.

Wall battery with selected small backup loads

Convert the AC requirement into a battery allowance

Suppose the 770 Wh AC requirement is supplied through a discharge path with an assumed 90% efficiency. The corresponding battery energy is about 856 Wh: 770 ÷ 0.90.

If the operating plan allows only 80% of nominal battery energy to be used for that event, the simplified nominal-capacity requirement is about 1.07 kWh: 856 ÷ 0.80. This excludes any consumption that has not already been included in the assumed efficiency and leaves no separate allowance for aging.

Those assumptions must be defined once. If the supplier quotes usable AC energy under relevant conditions, applying both deductions again could count losses or reserve twice. The nominal and usable capacity discussion explains how to keep the boundaries consistent.

The 1.07 kWh result is an energy estimate for this small load list. Available product sizes, power limits and the owner’s preferred reserve may lead to a larger battery.

Check power before accepting the capacity result

Work out which loads can run at the same time. Then assess the largest startup event while the other selected loads are already operating.

For a battery-side current estimate, divide AC power by battery voltage and assumed inverter efficiency. A hypothetical 3 kW output at 51.2 V and 92% efficiency requires about 64 A. At 46 V with the same assumed efficiency, it requires about 71 A.

Use the actual system’s supported voltage range and current limits in the final design. A battery with sufficient stored energy may still lack the required power, and an inverter’s short peak rating may not cover a longer startup event.

The LAINERGY CB-5-W is listed at 51.2 V, 100 Ah and 5.12 kWh nominal energy. Its capacity is one input to this review. The inverter pairing, discharge limits and backup-load behavior still need to be checked for the proposed application.

Decide what charge will be available when the outage starts

A battery used for daily self-consumption may be partly discharged when the grid fails. Ask the owner whether backup availability takes priority over routine energy use and set the operating plan accordingly.

For example, a requirement that assumes a full battery should be described that way in the proposal. If the owner instead expects the same duration from a maintained reserve, calculate the energy available from that reserve down to the permitted lower limit.

Solar generation during the outage can help only if the selected system supports the required operating mode and conditions allow it. For a conservative initial sizing case, calculate the required backup without relying on solar, then assess solar contribution separately.

Finish the quote with a load schedule

Include the selected circuits, expected duration, starting charge assumption and excluded loads. State how the owner should operate the system during an outage and which changes would require a new sizing check.

Send the load schedule, destination AC configuration and proposed inverter to LAINERGY. We can discuss options from the residential battery range against those inputs. Keep the agreed load schedule with the quotation so the installer and owner are working from the same backup requirement.