{"id":290,"date":"2026-11-20T01:00:00","date_gmt":"2026-11-20T01:00:00","guid":{"rendered":"https:\/\/www.lainergy.com\/?p=290"},"modified":"2026-11-16T07:27:32","modified_gmt":"2026-11-16T07:27:32","slug":"bess-procurement-rfq","status":"publish","type":"post","link":"https:\/\/www.lainergy.com\/ar\/bess-procurement-rfq\/","title":{"rendered":"\u0642\u0627\u0626\u0645\u0629 \u0645\u0631\u0627\u062c\u0639\u0629 \u0637\u0644\u0628\u0627\u062a \u0639\u0631\u0648\u0636 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0640 BESS: \u062a\u0632\u0648\u064a\u062f \u0627\u0644\u0645\u0648\u0631\u062f\u064a\u0646 \u0628\u0645\u0639\u064a\u0627\u0631 \u0645\u0648\u062d\u062f \u0644\u062a\u0642\u062f\u064a\u0645 \u0639\u0631\u0648\u0636 \u0623\u0633\u0639\u0627\u0631 \u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u0645\u0642\u0627\u0631\u0646\u0629"},"content":{"rendered":"<p>\u0625\u0646 \u0637\u0644\u0628 \u0639\u0631\u0636 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 (RFQ) \u0627\u0644\u0641\u0639\u0627\u0644 \u0644\u0646\u0638\u0627\u0645 \u062a\u062e\u0632\u064a\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0628\u0627\u0644\u0628\u0637\u0627\u0631\u064a\u0627\u062a \u064a\u0648\u0636\u062d \u0644\u0644\u0645\u0648\u0631\u062f\u064a\u0646 \u0627\u0644\u0623\u0647\u062f\u0627\u0641 \u0627\u0644\u062a\u064a \u064a\u062c\u0628 \u0623\u0646 \u064a\u062d\u0642\u0642\u0647\u0627 \u0627\u0644\u0645\u0648\u0642\u0639\u060c \u0648\u0627\u0644\u0645\u062c\u0627\u0644\u0627\u062a \u0627\u0644\u062a\u064a \u0633\u064a\u062a\u0645 \u0641\u064a\u0647\u0627 \u0642\u064a\u0627\u0633 \u0627\u0644\u0623\u062f\u0627\u0621\u060c \u0648\u0645\u0627 \u064a\u0634\u0645\u0644\u0647 \u0646\u0637\u0627\u0642 \u0627\u0644\u062a\u0648\u0631\u064a\u062f. \u0641\u0627\u0644\u0627\u0643\u062a\u0641\u0627\u0621 \u0628\u0637\u0644\u0628 \u062e\u0632\u0627\u0646\u0629 \u0630\u0627\u062a \u0633\u0639\u0629 \u0645\u062d\u062f\u062f\u0629 \u0628\u0627\u0644\u0643\u064a\u0644\u0648\u0648\u0627\u0637\/\u0633\u0627\u0639\u0629 \u0642\u062f \u064a\u0624\u062f\u064a \u0625\u0644\u0649 \u062a\u0644\u0642\u064a \u0639\u0631\u0648\u0636 \u062a\u0628\u062f\u0648 \u0645\u062a\u0634\u0627\u0628\u0647\u0629 \u0638\u0627\u0647\u0631\u064a\u064b\u0651\u0627\u060c \u0641\u064a \u062d\u064a\u0646 \u0623\u0646\u0647\u0627 \u062a\u0648\u0641\u0631 \u0645\u0639\u062f\u0627\u062a \u0648\u0642\u062f\u0631\u0627\u062a \u062a\u0634\u063a\u064a\u0644\u064a\u0629 \u0645\u062e\u062a\u0644\u0641\u0629.<\/p>\n<p>Start with a short project brief, then attach the load data and a response table. Leave uncertain items visible. A supplier can price an assumption; an unstated assumption is much harder to compare later.<\/p>\n<h2>Write the duty before choosing the cabinet<\/h2>\n<p>Describe the primary use: reducing a defined demand peak, shifting energy between periods, supporting selected loads during an outage, or a combination with an agreed priority. Include the required discharge window and the time available for recharge.<\/p>\n<p>Suppliers need these operating details to assess the proposed system. <a href=\"https:\/\/samrepo.nlr.gov\/help\/battery_storage_btm.html\" target=\"_blank\" rel=\"noopener\">SAM&#8217;s battery-system documentation<\/a> separates sizing, conversion, losses and operating constraints. Its structure is a useful reminder to specify more than nominal energy, although a procurement package also needs site and contractual details outside the model.<\/p>\n<p>If the site has competing objectives, state which takes priority. Maintaining backup reserve can reduce the energy available for routine dispatch. Ask suppliers to show that trade-off in their proposed operating plan.<\/p>\n<figure class=\"wp-block-image size-full\"><img width=\"1600\" height=\"800\" src=\"https:\/\/www.lainergy.com\/wp-content\/uploads\/2026\/11\/bess-procurement-rfq-body_image.webp\" class=\"attachment-full size-full\" alt=\"\u062e\u0632\u0627\u0646\u0629 \u062a\u062e\u0632\u064a\u0646 \u062a\u062c\u0627\u0631\u064a\u0629 \u0645\u0639\u0631\u0648\u0636\u0629 \u0641\u064a \u0642\u0633\u0645 \u062a\u062e\u0637\u064a\u0637 \u0639\u0631\u0648\u0636 \u0627\u0644\u0623\u0633\u0639\u0627\u0631\" style=\"width:100%;height:auto;aspect-ratio:2\/1;object-fit:cover\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lainergy.com\/wp-content\/uploads\/2026\/11\/bess-procurement-rfq-body_image.webp 1600w, https:\/\/www.lainergy.com\/wp-content\/uploads\/2026\/11\/bess-procurement-rfq-body_image-300x150.webp 300w, https:\/\/www.lainergy.com\/wp-content\/uploads\/2026\/11\/bess-procurement-rfq-body_image-1024x512.webp 1024w, https:\/\/www.lainergy.com\/wp-content\/uploads\/2026\/11\/bess-procurement-rfq-body_image-768x384.webp 768w, https:\/\/www.lainergy.com\/wp-content\/uploads\/2026\/11\/bess-procurement-rfq-body_image-1536x768.webp 1536w, https:\/\/www.lainergy.com\/wp-content\/uploads\/2026\/11\/bess-procurement-rfq-body_image-18x9.webp 18w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n<h2>Use a response table with units and boundaries<\/h2>\n<p>The following is a suggested buyer&#8217;s format, not a technical standard. Give every bidder the same version and request explicit exceptions.<\/p>\n<div style=\"overflow-x:auto\">\n<table class=\"table table-bordered\">\n<thead>\n<tr>\n<th>RFQ section<\/th>\n<th>Buyer supplies<\/th>\n<th>Supplier returns<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Site connection<\/td>\n<td>AC voltage, phase, frequency, connection point<\/td>\n<td>Proposed architecture and interface scope<\/td>\n<\/tr>\n<tr>\n<td>Duty<\/td>\n<td>Load record, discharge\/recharge window, priority<\/td>\n<td>Dispatch assumptions and limitations<\/td>\n<\/tr>\n<tr>\n<td>Power<\/td>\n<td>Required import\/export or backup duty<\/td>\n<td>Continuous AC power at stated conditions<\/td>\n<\/tr>\n<tr>\n<td>Energy<\/td>\n<td>Required delivered energy and reserve policy<\/td>\n<td>Nominal energy, usable basis and delivery estimate<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0628\u064a\u0626\u0629<\/td>\n<td>Location, temperatures, elevation, exposure<\/td>\n<td>Applicable ratings, derating and installation requirements<\/td>\n<\/tr>\n<tr>\n<td>Controls<\/td>\n<td>Existing meters, PV, generator and monitoring needs<\/td>\n<td>Supported integration, supplied hardware and responsibilities<\/td>\n<\/tr>\n<tr>\n<td>Verification<\/td>\n<td>Required project documents and acceptance criteria<\/td>\n<td>Exact documents, test scope and exclusions<\/td>\n<\/tr>\n<tr>\n<td>Commercial scope<\/td>\n<td>Quantity, delivery destination and requested scope<\/td>\n<td>Itemized supply, optional items and exclusions<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\u0627\u0633\u062a\u062e\u062f\u0645 <a href=\"https:\/\/www.lainergy.com\/ar\/commercial-battery-load-profile\/\">interval-load preparation guide<\/a> to prepare the data attachment. Include tariff information when asking for a savings analysis, and identify future loads that are absent from the historical record.<\/p>\n<h2>Ask where the energy promise is measured<\/h2>\n<p>A hypothetical requirement for 100 kW AC for two hours means 200 kWh delivered at the stated AC boundary. A cabinet labeled 200 kWh nominal does not automatically satisfy that requirement after operating limits and losses.<\/p>\n<p>State the starting condition, reserve, ambient conditions and whether the requirement applies at beginning of service or at a specified later point. Request the supplier&#8217;s calculation and capacity-retention basis. Do not add an arbitrary margin to every offer and assume that makes their underlying definitions equivalent.<\/p>\n<p>\u0627\u0644\u0640 <a href=\"https:\/\/www.lainergy.com\/ar\/2-hour-vs-4-hour-battery-storage\/\">two-hour versus four-hour storage guide<\/a> covers the power-to-energy relationship. Keep the RFQ focused on the site&#8217;s actual delivery requirement and let suppliers identify suitable configurations.<\/p>\n<h2>Close the gaps between equipment and installation<\/h2>\n<p>Ask who provides the transformer, protection equipment, meters, communication gateway, cables within the supplied package and commissioning support. Separately identify civil works, lifting, site cabling and any local approval work. The division varies by project; it should be written down before comparing totals.<\/p>\n<p>Request the installation requirements early enough to assess the site. Cabinet dimensions alone do not establish service access, ventilation needs or the suitability of the location. Have the project team review the offered instructions and applicable site requirements.<\/p>\n<p>For certification or test documents, ask which exact model and configuration they cover. If a required document is still pending, record its status and the delivery milestone. Do not treat a general company brochure as evidence for the complete offered system.<\/p>\n<h2>Compare exceptions before negotiating the final price<\/h2>\n<p>Create a separate column for deviations. An offer with less usable energy, excluded integration hardware or a different backup mode should remain visibly different until the scope is aligned.<\/p>\n<p>Ask the shortlisted suppliers to confirm an acceptance procedure, documentation handover and support responsibilities. For repeat orders, retain the approved specification and revision history so later substitutions receive a deliberate review.<\/p>\n<p>Send the RFQ package to <a href=\"https:\/\/www.lainergy.com\/ar\/contact\/\">LAINERGY<\/a> for discussion against our <a href=\"https:\/\/www.lainergy.com\/ar\/product-category\/commercial-storage\/\">\u0645\u062c\u0645\u0648\u0639\u0629 \u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u062a\u062e\u0632\u064a\u0646 \u0627\u0644\u062a\u062c\u0627\u0631\u064a<\/a>. Include the response table and request an itemized proposal with assumptions and exceptions alongside the equipment list.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u0625\u0646 \u0637\u0644\u0628 \u0639\u0631\u0636 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 (RFQ) \u0627\u0644\u0641\u0639\u0627\u0644 \u0644\u0646\u0638\u0627\u0645 \u062a\u062e\u0632\u064a\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0628\u0627\u0644\u0628\u0637\u0627\u0631\u064a\u0627\u062a \u064a\u0648\u0636\u062d \u0644\u0644\u0645\u0648\u0631\u062f\u064a\u0646 \u0627\u0644\u0623\u0647\u062f\u0627\u0641 \u0627\u0644\u062a\u064a \u064a\u062c\u0628 \u0623\u0646 \u064a\u062d\u0642\u0642\u0647\u0627 \u0627\u0644\u0645\u0648\u0642\u0639\u060c \u0648\u0627\u0644\u0645\u062c\u0627\u0644\u0627\u062a \u0627\u0644\u062a\u064a \u0633\u064a\u062a\u0645 \u0641\u064a\u0647\u0627 \u0642\u064a\u0627\u0633 \u0627\u0644\u0623\u062f\u0627\u0621\u060c \u0648\u0645\u0627 \u064a\u0634\u0645\u0644\u0647 \u0646\u0637\u0627\u0642 \u0627\u0644\u062a\u0648\u0631\u064a\u062f. \u0641\u0627\u0644\u0627\u0643\u062a\u0641\u0627\u0621 \u0628\u0637\u0644\u0628 \u062e\u0632\u0627\u0646\u0629 \u0630\u0627\u062a \u0633\u0639\u0629 \u0645\u062d\u062f\u062f\u0629 \u0628\u0627\u0644\u0643\u064a\u0644\u0648\u0648\u0627\u0637\/\u0633\u0627\u0639\u0629 \u0642\u062f \u064a\u0624\u062f\u064a \u0625\u0644\u0649 \u062a\u0644\u0642\u064a \u0639\u0631\u0648\u0636 \u062a\u0628\u062f\u0648 \u0645\u062a\u0634\u0627\u0628\u0647\u0629 \u0638\u0627\u0647\u0631\u064a\u064b\u0651\u0627\u060c \u0641\u064a \u062d\u064a\u0646 \u0623\u0646\u0647\u0627 \u062a\u0648\u0641\u0631 \u0645\u0639\u062f\u0627\u062a \u0648\u0642\u062f\u0631\u0627\u062a \u062a\u0634\u063a\u064a\u0644\u064a\u0629 \u0645\u062e\u062a\u0644\u0641\u0629.<\/p>","protected":false},"author":1,"featured_media":291,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[8],"tags":[],"class_list":["post-290","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/posts\/290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/comments?post=290"}],"version-history":[{"count":2,"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/posts\/290\/revisions"}],"predecessor-version":[{"id":304,"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/posts\/290\/revisions\/304"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/media\/291"}],"wp:attachment":[{"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/media?parent=290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/categories?post=290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lainergy.com\/ar\/wp-json\/wp\/v2\/tags?post=290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}